ATTENTION RESIDENTS IN THE VICINITY OF THE SUNSET BL CUL-DE-SAC,
EAST OF THE NB RAMPS

Excavation for the installation of a sewer line in the Sunset cul-de-sac is anticipated
to start on Monday, December 3, 2012. This work requires the closure of the cul-desac
to thru traffic.

What: Sewer line excavation and installation

When: Work is anticipated to start on Monday, December 3, 2012 for eight
weeks. Anticipated work hours are from 7am to 5pm, weather
permitting.

Where: East of the NB Sunset Bl ramps at the Sunset Bl cul-de-sac

What to expect:
• Access to local residents will be maintained in the Sunset cul-de-sac during
the full street closure with a flagger.
• Access to pedestrians will be maintained outside the construction zone.
• Driveways may be intermittently blocked by equipment, but will remain
accessible throughout the operation.
• Temporary interruption of service may be necessary during tie-in of lateral
connections to residences. Affected residents will be contacted 48-hours in
advance of tie-in and service interruption.
• Emergency vehicle access will be maintained.